Autoreclosure And Sectionalizer Operation
The main objectives of this demonstration is to
- Simulate the successive operations of autorecloser and sectionaliser operations during different recloser shots.
- To simulate the isolation of faulty section and restoring supply to the healthy sections remotely from the substation control station using sectionalisers.