Create documents for tests like FAT/SAT or CAT

Procedure for FAT/SAT/CAT

  • Select appropriate sensor for testing.
  • Run the simulation as per the instruction available on the screen and "START" the simulator.
  • After completion of simulation, check those sensors which are not acceptable beyond 2% in-accuracy.
  • Submit the selection and select another sensor.
  • Repeat this process for all the sensors.
  • After completion of all sensor, Result page will appear. Enter Name and download the report.
  • Run the boiler and heat exchanger plant and observe the operation.
  • Click on next level button and enter appropriate sequence activities occured during process.
  • Click on next level button and select appropriate sequence of fault.
  • Submit the selection and click on Result button.
  • Enter Name and download report.
  • Run the boiler and heat exchanger plant and observe the operation.
  • Click on graph, datasheet for the reference.
  • Click on Result button.
  • Enter Name and download report.