Speed control of slipring Induction Motor.
STEP 1: Make connections as per the instructions given below. If the wire is wrongly connected, Click on node number to detach the wire.
From | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 9 | 10 | 11 | 16 | 17 | 18 | 19 | 20 |
To | 21 | 22 | 23 | 12 | 13 | 12 | 8 | 15 | 12 | 17 | 13 | 14 | 24 | 25 | 26 |
STEP 2: Click on "Check" button for checking the connections.
STEP 3: Check the connection and either detach the incorrect wire connection or Click on Reset button and start from step 1.
STEP 4: Switch on the MCB.
STEP 5: Click on the autotransformer knob.
STEP 6: Slide the knob of the Rheostat to change the resistance.
STEP 7: Click on "Add to table" button to insert the readings in the table.
STEP 8: Follow the procedure from step 6 to step 7, till you have the 6 readings in the table.
STEP 9: After taking minimum 6 readings, Click on the "Graph" button.
STEP 10: Click on "Print" button to print the full connections with graph and table.