To learn procedure to perform pre-commissioning activities

Procedure

1. Click on the "Start" button to start the simulation of pilot plant

  • Begin the simulation process by clicking the "Start" button.

2. Refer the project report and the specific pages mentioned

  • Check the specified page number for reference.
  • Provide the correct answer to proceed to the next level.
  • You can view the complete PDF by clicking on the "View PDF Page and 29" option.

3. Repeat the process for the remaining two phases viz. the ladder logic and wiring diagram

  • Follow the same steps for the remaining phases.

4. In the Last Step, View the result page

  • After completing all steps, the final result page will be displayed.

5. Download the Result

  • Click on the "Download Report" button to save the results.