Develop GA and mimic diagram of a control panel
Aim
Interpret GA drawing mimic diagram of a control panel of the process plant under consideration
Objectives
- To study various aspects related to General Arrangement drawing of a control panel
- To identify locations of panel mounted instruments and control system
- To comment on the suitability and standard practices followed while developing mimic diagram of a plant
- To develop a method to suggest modifications if any after commissioning