Corrosion Assessment in Rebars of RC Structures Using PZT patchesObjective: This simulation experiment is based on experimental data measured during actual accelerated corrosion tests carried out on reinforced concrete (RC) structures (embedded rebar). Apparatus Used: 1. An empty tank 2. Brine solution 3. PZT patch 4. Power supply 5. Copper rod as cathode 6. Copper rod holder 7. Concrete cube containing a rebar as anode ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
Step-1: (a) Click on add button to bring empty tank.
Step-1: (b) Click on tank to place it on the position.
Step-1: (c) Click on add button to bring brine solution.
Step-1: (d) Click on brine solution to pour it into the tank.
Step-1: (e) Click on add button to bring concrete cube containing a rebar.
Step-1: (f) Click on rebar to place it in the tank contaning brine solution.
Step-1: (g) Click on add button to bring copper rod holder.
Step-1: (h) Click on add button to bring copper rod.
Step-1: (i) Click on copper rod to fix it on the copper rod holder.
Step-1: (j) Click on next button.
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
Step-2: (a) Click on black clip to attach wire with copper rod.
Step-2: (b) Click on red clip to attach wire with rebar.
Step-2: (c) Click on next button.
Step-2: (d) Click on next button.
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
Condition of RC Specimen
Pristine/Healthy State
![]() ![]() ![]()
Condition of concrete cube and rebar after splitting
![]() splitting at 45 days Cracked Specimen after splitting at 120 days Corroded bar removed from specimen at 120 days ![]() ![]() ![]() |