Tools
Performance Tool
Validation Tool
Aim
Theory
Pretest
Procedure
Simulation
Posttest
References
Contributors
Feedback
Aim
Theory
Pretest
Procedure
Simulation
Posttest
References
Contributors
Feedback
To design astable multivibrator using 555 timer IC.
To construct and study the operation of an Astable Multivibrator by using 555 Timer IC.